In this article
The Global Maritime Distress and Safety System (GMDSS) combines terrestrial radio and satellite services for distress alerting, search-and-rescue coordination and safety information. It is neither a single unit nor just a distress button. An effective installation must meet the requirements for the particular vessel and its entire intended voyage.
History and scope of GMDSS
GMDSS was fully implemented on 1 February 1999. It developed earlier maritime radio arrangements by combining automatic DSC alerting, satellite communications and safety-information distribution. Modernized SOLAS/GMDSS requirements took effect on 1 January 2024, accommodating new services and removing some obsolete requirements.
SOLAS generally covers passenger ships and cargo ships of 300 GT and above on international voyages. GT means gross tonnage, not the vessel’s weight in tonnes. Smaller vessels and other categories may fall under national requirements; a recreational yacht and a SOLAS ship should not be assumed to need identical equipment.
Sea areas A1-A4
The sea areas are based on the availability of the relevant alerting services. A1 and A2 are defined by the appropriate governments; they are not universal bands at fixed distances from every coastline.
| Sea area | Meaning |
|---|---|
| A1 | Coverage of at least one VHF coast station providing continuous DSC alerting. |
| A2 | Outside A1, within the coverage of at least one MF coast station providing continuous DSC alerting. |
| A3 | Outside A1 and A2, within a recognized satellite service supported by the ship’s terminal, providing continuous alerting. |
| A4 | Areas outside A1, A2 and A3. |
A3 should no longer be described only as Inmarsat coverage between fixed latitudes. The satellite service supported on board matters when determining the sea area, and Iridium covers polar regions as well. Being close to shore alone also does not establish that a vessel is in A1.
What equipment makes up the installation?
- VHF with DSC: voice communication and digital selective calling. VHF alone is not the full required installation, even in A1.
- MF or MF/HF with DSC: communications equipment selected for the sea area and accepted compliance configuration.
- A terminal for a recognized satellite service: provides distress and safety functions in an appropriate installation; an ordinary satellite phone or internet service is not automatically GMDSS equipment.
- MSI and SAR-information reception: for example NAVTEX and relevant satellite services, selected to cover the complete voyage.
- EPIRB: a satellite distress beacon with the correct mounting, coding and registration.
- SART or AIS-SART and survival-craft VHF: locating survival craft and communicating at the incident scene.
- Power and data sources: appropriate energy supplies, current position and correct vessel identification.
The number of survival-craft VHF radios and SART/AIS-SART units depends, among other factors, on vessel type and GT, rather than a simple assignment to A1-A4. Check the vessel’s documents and administration requirements, including equipment stowage arrangements.
Surveys and methods of maintaining availability
A statutory radio survey, a periodic equipment test and routine service diagnostics have different purposes. Scope, intervals and the qualifications of the provider must be checked against the relevant requirements and vessel documents. Reports and radio records should reflect the work actually performed.
Checks extend beyond the terminals. Antennas and cables, position inputs, MMSI and vessel details, alarms, safety-information reception and reserve power are important. An annual AIS test concerns navigational equipment and should not be presented as a test of the complete GMDSS installation.
SOLAS provides for methods including duplication, shore-based maintenance and at-sea electronic maintenance in arrangements accepted by the administration. A3/A4 availability is maintained using at least two methods in combination. At-sea maintenance needs the appropriate competence, tools and spares; SBM is not simply any service visit in port.
Operator qualifications and crew preparation
Operators need the qualifications applicable to the vessel and operating area. A blanket statement that every A3/A4 ship must have two GOC holders should not be made without reference to the administration requirements and safe-manning document.
The crew should know the actual installation: power sources, equipment status, survival-equipment locations and shipboard procedures. Tests must follow the instructions for the particular model. Sending a real distress alert is not a way to check that equipment works.
What matters before a voyage?
GMDSS supports prompt alerting and the exchange of rescue-related information, but its effectiveness depends on installation and operation. When planning an upgrade, establish the route, flag, existing equipment, satellite services, power condition and required maintenance methods. Replacing one terminal does not automatically make the complete installation compliant.
If a fault appears during generator operation, a power transfer or position reception, the circumstances are as useful as the alarm code. Documentation helps distinguish a faulty unit from an installation problem.
Detailed articles and service
Planning bridge-equipment diagnostics, service or an upgrade? See our marine navigation and communication services. To help define the work, prepare the equipment model, vessel flag, symptoms and any available test reports.